Straumann SLActive Lab

Andover, MA

  • Construction of a Class 10,000 clean room, an acid resistant treatment room, assembly areas and a sandblasting chamber
  • Total 6,500 SF and the mezzanine itself was 2,000 SF
  • Construction was phased over a six month schedule to blend with the owner’s operations